番路彈藥庫拓寬案_施工中(30%)現勘意見紀錄表_2022/04/22
於本案施工進度過30%後,進行現勘確認自主檢查表項目及環境現況。同時向施工廠商了解後續施工之進度規劃,提供生態相關議題現場諮詢。